Subject : SAVEH HYDRO-POWER STATION AND IRRIGATION SYSTEM (Turn key)
Place : Saveh
Taskmaster : Tehran Regional water authority
Consultant : Moshanir Consulting engineers
Start : 1991
End : 1995
Description :
This project located in the west of Saveh, near Asiabak village. The hydro-power station is a complementary part of Saveh dam, in order to reserve the output of the dam for irrigation purpose.
Specifications
•Station output: 5 MWatt
•Water transmission tunnel: 410 m long, 4 m diameter
•Length of canal: 9.5 km
•Earth works: 1,000,000 m3
•Concrete works: 45,000 m3
•Steel works: 3,100 ton
Manpowers
2,000,000 person.hour